韩国精品一区二区无码视频_教官掀起衣服含着奶头h渺渺视频_无码专区中文字幕av_性教育片巜做爰片_国产视觉盛宴在线视频_欧美 日韩 中文字幕 亚洲_亚洲一卡2卡三卡4卡_《电车欲淫2》伦理_两根双龙玩弄尿喷h肉_人善交oooooo另类毛片

HOME SOLUTIONS

Three Gorges Ulanqab Wind-Solar-Storage Integrated Project

This pioneering 2GW hybrid wind-solar-storage integrated project comprises 1.7GW of wind capacity, 300MW of solar capacity, and a 550MW/1100MWh energy storage system. SIFANG’s multi-source coordinated control system employs a three-tier architecture—consisting of a centralized control center, coordination controllers, and station controllers—to enable the precise dispatch of wind, solar, and storage units. It provides grid-support capabilities for hybrid renewable plants, including peak shaving, load balancing, power smoothing, and primary frequency regulation.


Related Projects